Physical server Commissioning/De-commissioning

This support forum board is for support questions relating to Nagios XI, our flagship commercial network monitoring solution.
Locked
lafargeuser
Posts: 341
Joined: Thu Sep 27, 2012 12:23 am

Physical server Commissioning/De-commissioning

Post by lafargeuser »

How to monitor Physical server Commissioning/De-commissioning ?
slansing
Posts: 7698
Joined: Mon Apr 23, 2012 4:28 pm
Location: Travelling through time and space...

Re: Physical server Commissioning/De-commissioning

Post by slansing »

What exactly are you looking to monitor in this respect? There could be a multitude of things to check, of course when a server goes down, so does it's network connection, so you could make a check as simple as pining it's address, though it won't tell you much as the server could go down for decommissioning, or for another reason, but then again if it was going down you would loose any way to check against it unless it was managed by another piece of software you could check against.
abrist
Red Shirt
Posts: 8334
Joined: Thu Nov 15, 2012 1:20 pm

Re: Physical server Commissioning/De-commissioning

Post by abrist »

Are you trying to add and remove configs on the fly (for elastic environments)?
Former Nagios employee
"It is turtles. All. The. Way. Down. . . .and maybe an elephant or two."
VI VI VI - The editor of the Beast!
Come to the Dark Side.
lafargeuser
Posts: 341
Joined: Thu Sep 27, 2012 12:23 am

Re: Physical server Commissioning/De-commissioning

Post by lafargeuser »

Yes.
When server installed & configured in Nagios for monitoring, I assume it is stage of server commissioning & when server removed from production environment after specific period, comes in De-commissioning.
slansing
Posts: 7698
Joined: Mon Apr 23, 2012 4:28 pm
Location: Travelling through time and space...

Re: Physical server Commissioning/De-commissioning

Post by slansing »

What are you looking to monitor in this respect? As was already stated this is a manual sort of thing, you could add a note to the host that will show you when a server is going to be decommissioned, then, if it goes down, and it is on that date you could remove it. Otherwise, you may want to look at building a custom component which would allow you to log commission dates, and then from the pool of hosts, remove certain ones when the time comes.