Timeperiod
Posted: Wed Aug 14, 2013 12:19 pm
We are testing a data feed using timeperiod (09:10 - 18:15).
Since the data flow may stop few minutes before we stop monitoring at 18:15 the monitor state may remains red until the next check on 09:10 the following day.
Is there a way to switch the monitor to OK outside of the check period? Is scheduled downtime is the only way?
Since the data flow may stop few minutes before we stop monitoring at 18:15 the monitor state may remains red until the next check on 09:10 the following day.
Is there a way to switch the monitor to OK outside of the check period? Is scheduled downtime is the only way?