Hello XI Support
How to exclude / mark downtime for SLA report in case when it have already happened?
Say some downtime happened outside of pre-scheduled hours
How to exclude one from the report?
Thank you,
Dimitri
How to exclude 1-2 hours in a month from SLA reports
Re: How to exclude 1-2 hours in a month from SLA reports
This isn't going to be possible. The reporting feature has been made so that any time that has already passed, cannot be modified.
Former Nagios Employee
Re: How to exclude 1-2 hours in a month from SLA reports
So only by timeperiods.. is there way to make timeperiod a monthly thing instead of weekly?rkennedy wrote:This isn't going to be possible. The reporting feature has been made so that any time that has already passed, cannot be modified.
Re: How to exclude 1-2 hours in a month from SLA reports
I'm not sure modifying an existing time period will work either, it'd take some testing to be honest.
To answer your question though, yes, you can have time periods be defined on a monthly basis. Take a look at this as a sample - https://assets.nagios.com/downloads/nag ... timeperiod
To answer your question though, yes, you can have time periods be defined on a monthly basis. Take a look at this as a sample - https://assets.nagios.com/downloads/nag ... timeperiod
Former Nagios Employee
Re: How to exclude 1-2 hours in a month from SLA reports
Please close. Worked for us when edited time-periods for adjusted reportingrkennedy wrote:I'm not sure modifying an existing time period will work either, it'd take some testing to be honest.
To answer your question though, yes, you can have time periods be defined on a monthly basis. Take a look at this as a sample - https://assets.nagios.com/downloads/nag ... timeperiod